Substation Grounding Design ELCL 9098
Our Substation Grounding Design course focuses on the correct design for a substation grounding system using the ETAP software grounding model and following the standard requirements of the IEEE 80. Learn how to correctly model a grounding system by calculating ground potential rise (GPR), touch voltage and step voltage limits. Get the skills you need to ensure the safety of personnel and equipment by studying different scenarios and grounding interconnection.
Note(s)
Course Essentials:
The ETAP software used in this course requires a computer with a 2 GHz (or greater) processor, 8 GB (or greater) RAM and a Microsoft Windows 8 (or higher) 64-bit operating system.
Prerequisites
You must have completed our ELCL 9087 Electrical Substations and Protection Co-ordination (Online) course.
Hours and Fees
Hours
Fee
Course Sections
- Contact Information
- Contact:
- Technology Department
- Email:
- cetechnology@georgebrown.ca
- Phone:
- Office Location(s):
Read about our textbooks policy, and remember that the Continuing Education attendance policy and closure dates differ from those for full-time college programs.